Instruments

Licensing and registration

Everything required to apply for, obtain, maintain, modify, renew, transfer or surrender an instrument under the Act. Nothing may be demanded of an applicant which is not published here or in a Schedule to the regulations.

What you propose to doWhat you needFormUnder
Generate for consumption at your own premisesRegistration only. No licence, no concurrence.A-1reg. 35
Supply in bulk to a company in your own group which is a bulk power consumerRegistration and concurrence. Still no licence.A-1 then A-1Areg. 40
Supply occupiers at the premises of a group companyRegistration and concurrence, on further conditions as to metering and mark-up.A-1 then A-1Areg. 41(3)
Supply a business outside your group, however largeGeneration and supply licences. This is not captive use.A-2 and A-3ss. 15, 16
Supply electric power to the provincial gridA licence, whatever the scale.A-2 and A-3s. 13(2)
Build and operate a distribution networkDistribution licence, with open access obligations.A-4s. 17
Serve an unserved or underserved settlementMicrogrid licence, a single unified instrument.A-5s. 18
Transmission within the Province, storage as a business, EV charging, a pilotSpecial purpose licence.A-6s. 14

Not sure which row applies to you? Use the checker.

Captive registration

Section 13 of the Act requires a captive generation company to register. It does not require a licence.

Registration by itself authorises you to generate and consume the electricity at your own premises. That is the whole of what a certificate of registration permits.

To supply anyone else, even a company in your own group, you must first obtain the concurrence of the Authority.

What you file

  • Form A-1 with the particulars in Schedule II
  • Form U-1 verification on oath
  • Form U-4 undertaking as to captive use, sworn
  • Form U-6 declaration of solvency
  • Single line diagram, site plan and metering schedule
Solar generation plant and industrial works on the same premises
Renewable generationcaptive source
Your own worksself-consumption

Sunlight in, metered, consumed on site

The commonest captive arrangement in Sindh: an array on the roof or in the yard, the generation and the consumption metered separately as regulation 37 requires, and nothing leaving the premises. That is registration under section 13, and no licence at all.

Draft fee schedule: not yet notified

The figures below are from the draft Fees and Charges Regulations, 2026. They are indicative and subject to change. No fee or period in that draft is enforceable until the instrument is notified in the official Gazette.

Registration fee Draft

Installed capacityRegistrationAnnual
Up to 500 kW10,0005,000
500 kW – 2 MW25,00012,500
2 – 5 MW50,00025,000
5 – 10 MW100,00050,000
Above 10 MW250,000125,000

Draft figures in rupees. The draft provides for an annual fee at half the registration fee, due 31 July. These provisions are not yet notified.

Annual return

A registrant files Form R-1 each 31 July: net generation, self-consumption, and the quantum supplied under each concurrence. Quantities only, no commercial terms. No fee.

Bagasse and biogas generation plant supplying a mill on the same premises
Bagasse / biogasrenewable fuel
Generationengine / power plant
Your own worksmill / industrial facility

Bagasse and biogas count too

A sugar mill burning its own bagasse, or a digester on farm waste, is captive generation in exactly the same way as a solar array. The fuel makes no difference to the instrument you need. What matters is who consumes the electricity.

Concurrence

Concurrence is a written confirmation by the Authority, given before supply begins, that a proposed supply within your corporate group falls within captive use. It is not a licence.

Who may be supplied

A company which controls you, which you control, or which is under common control with you. More than fifty per cent of the voting rights, or the power to appoint a majority of directors.

The five grounds of refusal

Not an affiliate; not within regulation 5(2); the affiliation is one created to bring the supply within captive use; metering inadequate; or you are in breach of an existing condition. No other ground.

What the Authority may not do

It may not examine, approve or refuse the price or any commercial term of the supply. Concurrence verifies who and how much, never for how much.

Supplying occupiers at a group company’s premises

Concurrence is granted on two further conditions. Each occupier must be metered individually, and the group company may not recover from an occupier more than it pays you for that occupier’s electricity. Without the second condition the group company would be an unlicensed reseller taking a margin.

Concurrence is decided within 30 working days of a complete application. It is renewable, and where you apply before expiry it continues in force until the application is decided.

The five licences

Section 16

Generation licence

Construct, own and operate a generation facility and sell the output to a person authorised to buy it. A generation licence does not by itself authorise supply to a consumer.

Form A-2 · indicative term up to 30 years

Section 15

Electric power supply licence

Supply consumers within a service territory, which may be geographic, spatial or virtual. A virtual territory is defined by the consumers you have contracted with rather than by area.

Form A-3 · indicative term up to 20 years

Section 17

Distribution licence

Build and operate a distribution system. You must provide access to others on terms no less favourable than you give your own supply business, and ring-fencing conditions apply.

Form A-4 · indicative term up to 25 years

Section 18

Microgrid licence

A single unified instrument for generation, distribution and supply in an unserved or underserved territory. The consumer tariff is determined by the Authority after a public hearing, and you must connect anyone within the territory.

Form A-5 · indicative term up to 20 years

Section 14

Special purpose licence

For a specified electric power service business: a transmission facility within the Province which does not form part of the national grid, storage operated as a business of supplying others, an electric vehicle charging network, a facility on a site vested in Government under section 44, or a pilot project. Conditions as to access, charges and safety are imposed.

Form A-6

Fees

Draft only: not yet enforceable

The table below reproduces Schedule I of the draft Fees and Charges Regulations, 2026. The instrument has not yet been notified, so these figures are indicative and no fee described here is presently enforceable. Under the draft, no charge could be made unless Schedule I provides for it.

BandLicence application feeLicence issue feeRenewal feeAnnual fee
Up to 1 MW100,00050,00050,00025,000
Above 1 MW and up to 10 MW250,000250,000125,000100,000
Above 10 MW and up to 50 MW500,000500,000250,000250,000
Above 50 MW1,000,0001,000,000500,000500,000

No fee is payable for

A consumer complaint at any stage · an objection to an application · resubmission after a deficiency letter · an application returned without being entertained, where the fee is refunded · an intimation which needs no decision · surrender of a licence · the annual return in Form R-1 · inspection of a public register · a submission in a public consultation.

Forms

Applications

A-1 captive registration · A-1A concurrence · A-2 generation · A-3 supply · A-4 distribution · A-5 microgrid · A-6 special purpose · A-7 modification · A-8 renewal · A-9 transfer · A-10 surrender · A-11 change in particulars · A-12 lender security

Undertakings

U-1 verification on oath · U-2 general undertaking · U-3 declaration of affiliation · U-4 undertaking as to captive use · U-5 declaration by directors · U-6 declaration of solvency · U-7 connected interests · U-8 continuing disclosure

Issued by the Authority

C-1 certificate of registration · C-2 acknowledgement · C-3 certificate of completeness · C-4 deficiency communication · C-5 instrument of concurrence · L-1 standard form of licence · R-1 annual return

Publication pending

Downloadable copies of every form will appear here on notification. Until then, ask the facilitation desk and a copy will be sent to you.